lock chamber
英 [lɒk ˈtʃeɪmbə(r)]
美 [lɑːk ˈtʃeɪmbər]
网络 闸室
英英释义
noun
- enclosure consisting of a section of canal that can be closed to control the water level
双语例句
- The realizable κ~ε turbulent model was used to carry out the unsteady calculation about the simulation system which was composed by batch handling lock hopper and scrubbing cooling chamber. The result of numerical simulation agrees well with the operation value.
在由间歇排渣型锁斗和洗涤冷却室组成的模拟系统中,应用Realizableκ~ε湍流模型进行了非稳态计算,得到的计算结果和实际情况比较吻合。 - Application of DFS Algorithm in the Arranging of Three-gorges Permanent Lock Chamber
DFS算法在三峡永久船闸优化编排中的应用 - Application of Monte-Carlo Method in Reliability Analysis against Sliding for Gate Lock Chamber
蒙特卡罗法在水闸闸室可靠度分析中的应用 - Technical measures taken for the Zaohe3rd lock chamber are discussed in view of the construction characteristics and thorny problems and according to the construction procedure.
针对皂河三线船闸闸室施工特点、难点,依据闸室施工工序,提出了应采取相应技术措施施工。 - In the course of filling of Mashi Lock, a lot of air from the valve well comes into the culvert so as to produce many big air bubbles in the chamber, which is dangerous to the passing ships.
麻石船闸在灌水过程中,输水廊道的阀门井处大量进气。空气经廊道进入闸室,在闸室中形成大气泡,威胁过闸船舶安全。 - Anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP
三峡永久船闸北线四闸室结构缝防渗处理 - Discussion on lock gate superimposing float chamber
船闸闸门增设浮箱问题的探讨 - This paper introduces the technology of anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP's permanent lock, mainly states the technique and material used in project as well as construction process.
本文介绍了三峡永久船闸北线四闸室结构缝防渗处理工程中处理的工艺、使用的材料、施工的过程。 - The calculation methods of lock chamber wall are mostly approximate with many assumptions, which still need proving both by theory and experiments.
对于岩基上船闸闸室墙的计算方法大多均是作了许多假定不完善的近似方法,其假定是否成立仍需在理论、实验上进一步探讨。 - Horizontal displacement moves to the ship lock chamber, the maximum deformation is 26.14 mm. With the end of excavation the deformation approximately trends to be stable, and at present the deep rock mass of high slope is in the steady condition.
岩体水平向位移表现为向闸室方向,最大变形为26.14mm,随着开挖的结束,变形基本趋于稳定,目前高边坡深层岩体处于稳定状态。